Custom Software

A 90‑Day Custom Software Playbook

Speed is a strategy. This playbook compresses risk with a time‑boxed MVP approach.

Phase 1: Discovery (Weeks 1–3)

  • Stakeholder interviews → define outcomes, guardrails.
  • User journeys & JTBD → capture pains and moments that matter.
  • Success metrics → adoption, cycle time, error rates.

Phase 2: Design (Weeks 4–5)

  • Low‑fi wireframes → validate flows fast.
  • Design system seeds → buttons, inputs, spacing, tokens.
  • Acceptance criteria → Definition of Ready/Done.

Phase 3: Build (Weeks 6–10)

  • Agile sprints (2 weeks); demo every Friday.
  • CI/CD with automated tests; feature flags for safe releases.
  • Data model: pick the simplest schema that works.

Phase 4: Pilot & Feedback (Weeks 11–12)

  • UAT with 10–20 target users.
  • Instrument analytics (events, funnels, NPS).
  • Post‑launch backlog prioritized by impact.

Risk Controls

  • Scope freeze mid‑build.
  • Non‑functional requirements defined early (performance, security).
  • Rollback and observability are non‑negotiable.

Author

solutionsmentors_bm3svn

Leave a comment

Your email address will not be published. Required fields are marked *